Model # HD02810

Internet #202924651

Store SKU #766592

TrafficMASTER Critical Path - Color Flax Berber 12 ft. Carpet
0859013002071

TrafficMASTER

Critical Path - Color Flax Berber 12 ft. Carpet

$2.03 /sq. ft.
Covers 9.0 sq. ft.
$18.27 /square yard

Choose Your Options

Flax
  • Cream
  • Flax
  • Khaki
  • Mocha
  • Pepper
  • Sparkle Gray
  • Terra Cotta
  • Tumbleweed
store icon Loading Buying Options...
package icon Loading Buying Options...
Sorry, but we ran into issues loading these options. Please try refreshing.

Frequently Bought Together

Product Overview

INSTALLATION SERVICES

What to Consider Before You Buy

The Home Depot offers professional flooring installation by industry experts with the experience to get the job done right.

If you're interested in having us install your new flooring, schedule an appointment to have our rooms professionally measure before you buy the flooring materials. Otherwise, we cannot install it for you.

3 Steps to Expert Installation

Homedepot Image

1. Schedule an In-Home Measure

We'll come evaluate your site, verify measurements and determine any special installation requirements. The measure fee (starting from $35) will be credited toward the cost of your installation.

Homedepot Image

2. Meet with a Specialist In-Store

Our specialist will help you choose the best flooring for your needs and schedule your professional installation appointment.

Homedepot Image

3. Transform Your Home

Know your project is getting done right. We only partner with flooring installation experts you can rely on.

Accent your floors with the TrafficMASTER Critical Path Flax 12 ft. Carpet. The continuous fibers help minimize shedding and offer a comfortable feel. This carpet resists stains and features Zipperlock dual bonding backing material for long lasting strength. It is Green Label Plus certified and eligible for recycling programs.
  • BCF Strudon/PET Blended Fiber construction offers durability
  • Lifetime stain warranty as long as the carpet is installed and maintained indoors according to carpet and rug institute
  • Critical path is scoured and extracted to remove processing oils which makes the carpet easier to clean and helps prevent accelerated soiling known as rapid resoil
  • Manufactured from continuous fibers to minimize shedding
  • Yearly hot water extraction is recommended to maintain your carpet; daily spot cleaning and wiping up spills as quickly as possible will prolong the beauty of your investment
  • Machine tufted and backed in Canada
  • Sold in 1 ft. increments to minimize waste
  • Zipperlock dual-bonding backing material provides strength
  • 6 lb. or 8 lb. pad recommended for residential installation -not included; 3/8 15 lb. pad for commercial installation-not included
  • Anti-shock properties help reduce static
  • Eligible for recycling programs
  • Carpet is Green Label Plus certified
  • Note: product may vary by store

Product Overview

Accent your floors with the TrafficMASTER Critical Path Flax 12 ft. Carpet. The continuous fibers help minimize shedding and offer a comfortable feel. This carpet resists stains and features Zipperlock dual bonding backing material for long lasting strength. It is Green Label Plus certified and eligible for recycling programs.

  • BCF Strudon/PET Blended Fiber construction offers durability
  • Lifetime stain warranty as long as the carpet is installed and maintained indoors according to carpet and rug institute
  • Critical path is scoured and extracted to remove processing oils which makes the carpet easier to clean and helps prevent accelerated soiling known as rapid resoil
  • Manufactured from continuous fibers to minimize shedding
  • Yearly hot water extraction is recommended to maintain your carpet; daily spot cleaning and wiping up spills as quickly as possible will prolong the beauty of your investment
  • Machine tufted and backed in Canada
  • Sold in 1 ft. increments to minimize waste
  • Zipperlock dual-bonding backing material provides strength
  • 6 lb. or 8 lb. pad recommended for residential installation -not included; 3/8 15 lb. pad for commercial installation-not included
  • Anti-shock properties help reduce static
  • Eligible for recycling programs
  • Carpet is Green Label Plus certified
  • Note: product may vary by store

Info & Guides

You will need Adobe® Acrobat® Reader to view PDF documents.  Download a free copy from the Adobe Web site.

Specifications

Dimensions

Approximate Width (in.)
144
Carpet Width (ft.)
12
Carpet roll width (in.)
144
Pattern Match Length (in.)
.375
Pattern Match Width (in.)
.875
Pile height (in.)
.28
Product Width (in.)
144
Standard Roll Length (ft.)
120

Details

Approximate Length (in.)
12
Carpet Features
Fade and Wear Resistant,Glue Down Allowed,Stain Resistant
Carpet Fiber
Olefin
Carpet Style Type
Berber
Color Family
Beige / Cream
Color/Finish
Flax
Commercial / Residential
Commercial / Residential
Density
4700
Face Weight (oz./ sq.yd.)
26
Flooring Product Type
Carpet
In-Store Availability
Special Order
Indoor/Outdoor
Indoor
Insulation R-Value
.604
Material
Olefin (80%), Polyester (20%)
Origin
Imported
PAR Rating
3
R-Value
.604
Returnable
Non-Returnable
Roll/Tile
Roll
Warranty Type
Stain Warranty,Wear Warranty
Yarn Gauge (in.)
.1

Warranty / Certifications

Manufacturer Warranty
Lifetime Residential and Commercial Wear, Lifetime Zipperlock & No Edge Ravel, Lifetime Stainproof no exceptions, Lifetime antishock

Specifications

Dimensions

Approximate Width (in.)
144
Carpet Width (ft.)
12
Carpet roll width (in.)
144
Pattern Match Length (in.)
.375
Pattern Match Width (in.)
.875
Pile height (in.)
.28
Product Width (in.)
144
Standard Roll Length (ft.)
120

Details

Approximate Length (in.)
12
Carpet Features
Fade and Wear Resistant,Glue Down Allowed,Stain Resistant
Carpet Fiber
Olefin
Carpet Style Type
Berber
Color Family
Beige / Cream
Color/Finish
Flax
Commercial / Residential
Commercial / Residential
Density
4700
Face Weight (oz./ sq.yd.)
26
Flooring Product Type
Carpet
In-Store Availability
Special Order
Indoor/Outdoor
Indoor
Insulation R-Value
.604
Material
Olefin (80%), Polyester (20%)
Origin
Imported
PAR Rating
3
R-Value
.604
Returnable
Non-Returnable
Roll/Tile
Roll
Warranty Type
Stain Warranty,Wear Warranty
Yarn Gauge (in.)
.1

Warranty / Certifications

Manufacturer Warranty
Lifetime Residential and Commercial Wear, Lifetime Zipperlock & No Edge Ravel, Lifetime Stainproof no exceptions, Lifetime antishock

More Products With These Features

Search

Customer Questions & Answers

Does this carpet have to be glued down? Can it be stretched and attached to tack strip?

Asked by: Anonymous
It was attached to a tack strip by the installers - it was not glued down.
Answered by: Jason
Date published: 2017-08-02

can this carpet be glued direct to underlayment with no pad?

can this carpet be glued direct to underlayment with no pad?
Asked by: Vince
Yes it can.
Answered by: JosephHDATL
Date published: 2017-06-26

How long does it take from ordering the carpet to receiving it ?

How long does it take from ordering the carpet to receiving it ?
Asked by: bea
Hi Bea, since carpet orders are handled through your local store, and the time of arrival on a product can depend on many different factors, we suggest that on the product page you may select the 'Schedule A Measure' button and follow the steps to determine in-store availability and pricing. You may also reach out to your local Home Depot store for more information and assistance as well. I have also provided below the link to our Carpet Installation page on Homedepot.com. We appreciate your business and look forward to serving you in the future. Thank you for shopping Home Depot! http://www.homedepot.com/webapp/catalog/servlet/ContentView?pn=SV_HS_Carpet_Installation&storeId=10051&langId=-1&catalogId=10053
Answered by: THDSupport
Date published: 2016-12-02

Ho to cut this carpet for seaming

HD02808 Critical Path -
Asked by: mike
You can cut the carpet with a utility knife.
Answered by: CommunityAnswer
Date published: 2016-03-06
  • y_2017, m_8, d_22, h_13CST
  • bvseo_bulk, prod_bvqa, vn_bulk_1.0.0-hotfix-1
  • cp_1, bvpage1
  • co_hasquestionsanswers, tq_12
  • loc_, sid_202924651, prod, sort_[SortEntry(order=NUM_ANSWERS, direction=DESCENDING), SortEntry(order=SUBMISSION_TIME, direction=DESCENDING), SortEntry(order=LAST_APPROVED_ANSWER_SUBMISSION_TIME, direction=DESCENDING), SortEntry(order=LAST_APPROVED_ANSWER_SUBMISSION_TIME, direction=DESCENDING), SortEntry(order=BEST_ANSWER_FEEDBACK_COUNT, direction=DESCENDING), SortEntry(order=POSITIVE_ANSWER_FEEDBACK_COUNT, direction=DESCENDING), SortEntry(order=NUM_ANSWERS, direction=DESCENDING)]
  • clientName_homedepot
  • bvseo_sdk, java_sdk, bvseo-3.1.1
  • CLOUD, getContent, 56ms
  • QUESTIONS, PRODUCT

Customer Reviews

  • bvseo_sdk, java_sdk, bvseo-3.1.1
  • CLOUD, getContent, 146ms
  • REVIEWS, PRODUCT
  • bvseo-msg: The resource to the URL or file is currently unavailable.;