TrafficMASTER Critical Path - Color Pepper 12 ft. Carpet-HD02809 at The Home Depot
Free shipping
Discontinued

TrafficMASTER

Model # HD02809

Internet # 202924648

Store SKU # 766592

Critical Path - Color Pepper 12 ft. Carpet


TrafficMASTER Critical Path - Color Pepper 12 ft. Carpet
 

This item has been discontinued.
The Home Depot no longer carries this specific product.

$1.88 / sq. ft.
$16.92/  square yard  (covers 9.0 sq. ft.)
Loading...

PRODUCT OVERVIEW

Model # HD02809

Internet # 202924648

Store SKU # 766592

Store SO SKU # 201586

Add luxury to your floors with the TrafficMaster Critical Path Pepper 12 ft. Carpet. The BCF Strudon/PET blended construction features a Zipperlock dual-bonding backing for added strength. This blended carpet resists stains and has minimal static for comfort. The pepper color coordinates with a variety of color schemes and will complement your living space.

  • BCF Strudon/PET blended fiber construction offers durability
  • Stain resistant to help maintain a pristine appearance
  • Manufactured from continuous fibers to minimize shedding
  • Scoured and extracted for convenience
  • Anti-shock properties help reduce static
  • Eligible for recycling programs
  • Zipperlock dual-bonding backing material provides strength
  • Green Label Plus
  • Note: Product may vary by store

Info & Guides

You will need Adobe® Acrobat® Reader to view PDF documents. Download a free copy from the Adobe Web site.

SPECIFICATIONS

Antimicrobial  No  Approximate Width (in.)  144 
Assembled Depth (in.)  1 in  Assembled Height (in.)  .4 in 
Assembled Width (in.)  144 in  Carpet Fiber  Other 
Carpet Style Type  Loop  Carpet Type  Active & Commercial 
Carpet Width (ft.)  12  Carpet roll width (in.)  144 
Color Family  Blacks  Color/Finish  Pepper 
Commercial / Residential  Commercial / Residential  Density  4700 
Face Weight (oz./ sq.yd.)  26  Glue Down Allowed?  Yes 
Hypoallergenic  No  Indoor/Outdoor  Indoor 
Manufacturer Warranty  Lifetime Residential and Commercial Wear, Lifetime Zipperlock & No Edge Ravel, Lifetime Stainproof no exceptions, Lifetime antishock  PAR Rating 
Padding Attached  No  Pattern Match Length (in.)  .375 
Pattern Match Width (in.)  .875  Pile height (in.)  .28 
Roll/Tile  Roll  Stain Resistant  Yes 
Standard Roll Length (ft.)  120  Water repellent  No 
Yarn Gauge (in.)  .1 

CUSTOMER REVIEWS

SHIPPING AND DELIVERY OPTIONS

Store Exclusive. This item is available for purchase in select stores only.