TrafficMASTER Critical Path - Color Sparkle Gray 12 ft. Carpet-HD02801 - The Home Depot
Message to Our Customers
Discontinued

TrafficMASTER

Model # HD02801

Internet # 202924616

Store SKU # 766592

Critical Path - Color Sparkle Gray 12 ft. Carpet

TrafficMASTER Critical Path - Color Sparkle Gray 12 ft. Carpet
 

This item has been discontinued.
The Home Depot no longer carries this specific product.
Please select another option below.

$1.88 / sq. ft.
$16.92/  square yard  (covers 9.0 sq. ft.)
Loading...

PRODUCT OVERVIEW

Model # HD02801

Internet # 202924616

Store SKU # 766592

Store SO SKU # 1001036549

The TrafficMaster Critical Path 01 Sparkle Gray Loop 12 ft. Carpet helps bring a fresh, new look to your home. This carpet features continuous BCF Strudon/PET blended fiber construction which helps to minimize shedding. The Zipperlock dual-bonding backing material provides strength for a long-lasting use. This carpet is eligible for recycling programs and is Green Label Plus certified.

  • BCF Strudon/PET blended fiber construction offers durability
  • Stain resistant to help maintain a pristine appearance
  • Manufactured from continuous fibers to minimize shedding
  • Scoured and extracted for convenience
  • Anti-shock properties help reduce static
  • Eligible for recycling programs
  • Zipperlock dual-bonding backing material provides strength
  • Green Label Plus
  • Note: Product may vary by store

Info & Guides

You will need Adobe® Acrobat® Reader to view PDF documents. Download a free copy from the Adobe Web site.

SPECIFICATIONS

Dimensions
Approximate Width (in.) 
144 
Carpet Width (ft.) 
12 
Carpet roll width (in.) 
144 
Pattern Match Length (in.) 
.375 
Pattern Match Width (in.) 
.875 
Pile height (in.) 
.28 
Product Depth (in.) 
Product Height (in.) 
0.4 
Product Width (in.) 
144 
Standard Roll Length (ft.) 
120 
Details
Antimicrobial 
No 
Carpet Fiber 
Other 
Carpet Style Type 
Loop 
Carpet Type 
Residential 
Color Family 
Grays 
Color/Finish 
Sparkle Gray 
Commercial / Residential 
Commercial / Residential 
Default Pad 
Berber 
Density 
4700 
Face Weight (oz./ sq.yd.) 
26 
Fiber content 
BCF Strudon/PET Blend 
Flooring Product Type 
Carpet 
Glue Down Allowed? 
Yes 
Hypoallergenic 
No 
Indoor/Outdoor 
Indoor 
Marine 
No 
Material 
80% BCF Strudon Olefin, 20% BCF PET 
PAR Rating 
Padding Attached 
No 
Recycled Materials (%) 
Roll/Tile 
Roll 
Stain Resistant 
Yes 
Water repellent 
No 
Yarn Gauge (in.) 
.1 
Warranty / Certifications
Manufacturer Warranty 
Lifetime Residential and Commercial Wear, Lifetime Zipperlock & No Edge Ravel, Lifetime Stainproof no exceptions, Lifetime antishock 

CUSTOMER REVIEWS

SHIPPING AND DELIVERY OPTIONS

Store Exclusive. This item is available for purchase in select stores only.