Model # HD02801

Internet #202924616

Store SKU #766592

Store SO SKU #1001036549

TrafficMASTER Critical Path - Color Sparkle Gray Textured Graphic Berber 12 ft. Carpet
0859013002002

TrafficMASTER

Critical Path - Color Sparkle Gray Textured Graphic Berber 12 ft. Carpet

$2.03 /sq. ft.
Covers 9.00 sq. ft.
$18.27 /square yard
Color/Finish: Sparkle Gray
  • Cream
  • Flax
  • Khaki
  • Mocha
  • Pepper
  • Sparkle Gray
  • Terra Cotta
  • Tumbleweed

Frequently Bought Together

Product Overview

INSTALLATION SERVICES

What to Consider Before You Buy

The Home Depot offers professional flooring installation by industry experts with the experience to get the job done right.

If you're interested in having us install your new flooring, schedule an appointment to have our rooms professionally measure before you buy the flooring materials. Otherwise, we cannot install it for you.

3 Steps to Expert Installation

Homedepot Image

1. Schedule an In-Home Measure

We'll come evaluate your site, verify measurements and determine any special installation requirements. The measure fee (starting from $35) will be credited toward the cost of your installation.

Homedepot Image

2. Meet with a Specialist In-Store

Our specialist will help you choose the best flooring for your needs and schedule your professional installation appointment.

Homedepot Image

3. Transform Your Home

Know your project is getting done right. We only partner with flooring installation experts you can rely on.

The TrafficMASTER Critical Path 01 Sparkle Gray Loop 12 ft. Carpet helps bring a fresh, new look to your home. This carpet features continuous BCF Strudon/PET blended fiber construction which helps to minimize shedding. The Zipperlock dual-bonding backing material provides strength for a long-lasting use. This carpet is eligible for recycling programs and is Green Label Plus certified.

  • BCF Strudon/PET blended fiber construction offers durability
  • Lifetime stain warranty as long as the carpet is installed and maintained indoors according to carpet and rug institute
  • Critical path is scoured and extracted to remove processing oils which makes the carpet easier to clean and helps prevent accelerated soiling known as rapid resoil
  • Manufactured from continuous fibers to minimize shedding
  • Yearly hot water extraction is recommended to maintain your carpet; daily spot cleaning and wiping up spills as quickly as possible will prolong the beauty of your investment
  • Machine Tufted and Backed in Canada
  • Sold in 1 ft. increments to minimize waste
  • Zipperlock dual-bonding backing material provides strength
  • 6 lb. or 8 lb. pad recommended for residential installation-not included; 3/8 15 lb. pad for commercial installation-not included
  • Anti-shock properties help reduce static
  • Eligible for recycling programs
  • Carpet is Green Label Plus certified
  • Note: Product may vary by store

Info & Guides

You will need Adobe® Acrobat® Reader to view PDF documents.  Download a free copy from the Adobe Web site.

Specifications

Dimensions

Details

Warranty / Certifications

More Products With These Features

Search

Customer Questions & Answers

  • bvseo_sdk, java_sdk, bvseo-3.1.1
  • CLOUD, getContent, 47ms
  • QUESTIONS, PRODUCT
  • bvseo-msg: The resource to the URL or file is currently unavailable.;

Customer Reviews

  • bvseo_sdk, java_sdk, bvseo-3.1.1
  • CLOUD, getContent, 33ms
  • REVIEWS, PRODUCT
  • bvseo-msg: The resource to the URL or file is currently unavailable.;