Model # HD02802

Internet #202924620

Store SKU #766592

TrafficMASTER Critical Path - Color Terra Cotta Textured Graphic Berber 12 ft. Carpet
0859013002019

TrafficMASTER

Critical Path - Color Terra Cotta Textured Graphic Berber 12 ft. Carpet

$2.03 /sq. ft.
Covers 9.0 sq. ft.
$18.27 /square yard

Choose Your Options

Terra Cotta
  • Cream
  • Flax
  • Khaki
  • Mocha
  • Pepper
  • Sparkle Gray
  • Terra Cotta
  • Tumbleweed
store icon Loading Buying Options...
package icon Loading Buying Options...
Sorry, but we ran into issues loading these options. Please try refreshing.

Frequently Bought Together

Product Overview

INSTALLATION SERVICES

What to Consider Before You Buy

The Home Depot offers professional flooring installation by industry experts with the experience to get the job done right.

If you're interested in having us install your new flooring, schedule an appointment to have our rooms professionally measure before you buy the flooring materials. Otherwise, we cannot install it for you.

3 Steps to Expert Installation

Homedepot Image

1. Schedule an In-Home Measure

We'll come evaluate your site, verify measurements and determine any special installation requirements. The measure fee (starting from $35) will be credited toward the cost of your installation.

Homedepot Image

2. Meet with a Specialist In-Store

Our specialist will help you choose the best flooring for your needs and schedule your professional installation appointment.

Homedepot Image

3. Transform Your Home

Know your project is getting done right. We only partner with flooring installation experts you can rely on.

Enhance the look of your indoor living space with the TrafficMASTER Critical Path Terra Cotta 12 ft. Carpet. This carpet features BCF Strudon/PET blended fibers for comfort and dual-bonding backing for long-lasting strength. The continuous fiber construction helps to minimize shedding while the terra cotta color offers a striking look.

  • 80% BCF Strudon/20% PET Blended Fiber construction offers durability
  • Lifetime stain warranty as long as the carpet is installed and maintained indoors according to carpet and rug institute
  • Critical path is scoured and extracted to remove processing oils which makes the carpet easier to clean and helps prevent accelerated soiling known as rapid resoil
  • Manufactured from continuous fibers to minimize shedding
  • Yearly hot water extraction is recommended to maintain your carpet; daily spot cleaning and wiping up spills as quickly as possible will prolong the beauty of your investment
  • Machine tufted and backed in Canada
  • Sold in 1 ft. increments to minimize waste
  • Zipperlock dual-bonding backing material provides strength
  • 6 lb. or 8 lb. pad recommended for residential installation - not included; 3/8 15 lb. pad for commercial installation - not included
  • Anti-shock properties help reduce static
  • Eligible for recycling programs
  • Carpet is Green Label Plus certified
  • Note: product may vary by store

Info & Guides

You will need Adobe® Acrobat® Reader to view PDF documents.  Download a free copy from the Adobe Web site.

Specifications

Dimensions

Approximate Width (in.)
144
Carpet Width (ft.)
12
Carpet roll width (in.)
144
Pattern Match Length (in.)
.375
Pattern Match Width (in.)
.875
Pile height (in.)
.28
Product Width (in.)
144
Standard Roll Length (ft.)
120

Details

Approximate Length (in.)
12
Carpet Features
Fade and Wear Resistant,Glue Down Allowed,Stain Resistant
Carpet Fiber
Olefin
Carpet Style Type
Berber
Color Family
Browns / Tans
Color/Finish
Terra Cotta
Commercial / Residential
Commercial / Residential
Density
4700
Face Weight (oz./ sq.yd.)
26
Flooring Product Type
Carpet
In-Store Availability
Special Order
Indoor/Outdoor
Indoor
Insulation R-Value
.604
Material
Olefin (80%), Polyester (20%)
Origin
Imported
PAR Rating
3
R-Value
.604
Returnable
Non-Returnable
Roll/Tile
Roll
Warranty Type
Stain Warranty,Wear Warranty
Yarn Gauge (in.)
.1

Warranty / Certifications

Manufacturer Warranty
Lifetime Residential and Commercial Wear, Lifetime Zipperlock & No Edge Ravel, Lifetime Stainproof no exceptions, Lifetime antishock

More Products With These Features

Search

Customer Questions & Answers

Does this carpet have to be glued down? Can it be stretched and attached to tack strip?

Asked by: Anonymous
It was attached to a tack strip by the installers - it was not glued down.
Answered by: Jason
Date published: 2017-08-02

can this carpet be glued direct to underlayment with no pad?

can this carpet be glued direct to underlayment with no pad?
Asked by: Vince
Yes it can.
Answered by: JosephHDATL
Date published: 2017-06-26

Ho to cut this carpet for seaming

HD02808 Critical Path -
Asked by: mike
You can cut the carpet with a utility knife.
Answered by: CommunityAnswer
Date published: 2016-03-06

how much is it for installation

Asked by: bill
Good Morning Bill! Thank you for your interest in TrafficMaster Critical Path. Installation costs are determined by many factors. Please contact your local store for information regarding install. YOu can find your local store number under the store finder tab and the top of home depot website.. http://www.homedepot.com
Answered by: TrafficMaster Expert
Date published: 2015-09-20
  • y_2017, m_8, d_18, h_14CST
  • bvseo_bulk, prod_bvqa, vn_bulk_1.0.0-hotfix-1
  • cp_1, bvpage1
  • co_hasquestionsanswers, tq_7
  • loc_, sid_202924620, prod, sort_[SortEntry(order=NUM_ANSWERS, direction=DESCENDING), SortEntry(order=SUBMISSION_TIME, direction=DESCENDING), SortEntry(order=LAST_APPROVED_ANSWER_SUBMISSION_TIME, direction=DESCENDING), SortEntry(order=LAST_APPROVED_ANSWER_SUBMISSION_TIME, direction=DESCENDING), SortEntry(order=BEST_ANSWER_FEEDBACK_COUNT, direction=DESCENDING), SortEntry(order=POSITIVE_ANSWER_FEEDBACK_COUNT, direction=DESCENDING), SortEntry(order=NUM_ANSWERS, direction=DESCENDING)]
  • clientName_homedepot
  • bvseo_sdk, java_sdk, bvseo-3.1.1
  • CLOUD, getContent, 103ms
  • QUESTIONS, PRODUCT

Customer Reviews

  • bvseo_sdk, java_sdk, bvseo-3.1.1
  • CLOUD, getContent, 135ms
  • REVIEWS, PRODUCT
  • bvseo-msg: The resource to the URL or file is currently unavailable.;