0859013002019

TrafficMASTER

Model HD02802

Internet #202924620

Store SKU #766592

Store SO SKU #1001036555

Critical Path - Color Terra Cotta Textured Graphic Berber 12 ft. Carpet

$2.03 /sq. ft.
Covers 9.00 sq. ft.
$18.27 /square yard
Color/Finish: Terra Cotta
  • Cream
  • Flax
  • Khaki
  • Mocha
  • Pepper
  • Sparkle Gray
  • Terra Cotta
  • Tumbleweed

Frequently Bought Together

Product Overview

INSTALLATION SERVICES

What to Consider Before You Buy

The Home Depot offers professional flooring installation by industry experts with the experience to get the job done right.

If you're interested in having us install your new flooring, schedule an appointment to have our rooms professionally measure before you buy the flooring materials. Otherwise, we cannot install it for you.

3 Steps to Expert Installation

Homedepot Image

1. Schedule an In-Home Measure

We'll come evaluate your site, verify measurements and determine any special installation requirements. The measure fee (starting from $35) will be credited toward the cost of your installation.

Homedepot Image

2. Meet with a Specialist In-Store

Our specialist will help you choose the best flooring for your needs and schedule your professional installation appointment.

Homedepot Image

3. Transform Your Home

Know your project is getting done right. We only partner with flooring installation experts you can rely on.

Enhance the look of your indoor living space with the TrafficMASTER Critical Path Terra Cotta 12 ft. Carpet. This carpet features BCF Strudon/PET blended fibers for comfort and dual-bonding backing for long-lasting strength. The continuous fiber construction helps to minimize shedding while the terra cotta color offers a striking look.

  • 80% BCF Strudon/20% PET Blended Fiber construction offers durability
  • Lifetime stain warranty as long as the carpet is installed and maintained indoors according to carpet and rug institute
  • Critical path is scoured and extracted to remove processing oils which makes the carpet easier to clean and helps prevent accelerated soiling known as rapid resoil
  • Manufactured from continuous fibers to minimize shedding
  • Yearly hot water extraction is recommended to maintain your carpet; daily spot cleaning and wiping up spills as quickly as possible will prolong the beauty of your investment
  • Machine tufted and backed in Canada
  • Sold in 1 ft. increments to minimize waste
  • Zipperlock dual-bonding backing material provides strength
  • 6 lb. or 8 lb. pad recommended for residential installation - not included; 3/8 15 lb. pad for commercial installation - not included
  • Anti-shock properties help reduce static
  • Eligible for recycling programs
  • Carpet is Green Label Plus certified
  • Note: product may vary by store

Info & Guides

You will need Adobe® Acrobat® Reader to view PDF documents.  Download a free copy from the Adobe Web site.

Specifications

Dimensions

Details

Warranty / Certifications

More Products With These Features

Search

Customer Questions & Answers

2 Questions2 Answers

Customer Questions & Answers

Critical Path - Color Terra Cotta Textured Graphic Berber 12 ft. Carpet
Critical Path - Color Terra Cotta Textured Graphic Berber 12 ft. Carpet

Ask your questions. Share your answers.

 
 
Clear Search Term
 
 
Sort By:
This question is from Critical Path - Color Terra Cotta Textured Graphic Berber 12 ft. Carpet
 
1 answer

Stairs

This question is from Critical Path - Color Terra Cotta Textured Graphic Berber 12 ft. Carpet
Asked by
spoon27
June 21, 2013
Can this product be used on stairs
0points
0out of 0found this question helpful.
Was this helpful?helpful0unhelpful0

Answer (1)

June 25, 2013
Answer: 
Thank you for your interest in Traffic Master Critical Path. Traffic Master warrants that this carpet will not wear more than 10% during the useful life of the carpet, provided that the carpet is properly installed and maintained indoors according to Traffic Master’s maintenance and installation recommendations. It can be installed on stairs using the Carpet and Rug Institute guidelines for installation. Read More
Thank you for your interest in Traffic Master Critical Path. Traffic Master warrants that this carpet will not wear more than 10% during the useful life of the carpet, provided that the carpet is properly installed and maintained indoors according to Traffic Master’s maintenance and installation recommendations. It can be installed on stairs using the Carpet and Rug Institute guidelines for installation. Although this material has a lifetime wear warranty, it is excludes carpet installed on stairs. Read Less
0points
0out of 0found this answer helpful.
Was this helpful?helpful0unhelpful0
This question is from Critical Path - Color Terra Cotta Textured Graphic Berber 12 ft. Carpet
 
1 answer

do you have anything like traffic master color terra cotta in 15' rolls

This question is from Critical Path - Color Terra Cotta Textured Graphic Berber 12 ft. Carpet
Asked by
Dan
March 12, 2013
0points
0out of 0found this question helpful.
Was this helpful?helpful0unhelpful0

Answer (1)

March 12, 2013
Answer: 
Dan
Thank you for your interest in Traffic Master Critical Path/ terra cotta. This style is only sold in the 12 ft width. Please visit the Home Depot website www.homedepot.com. You can narrow your search by checking the boxes on the left side of the page. This will filter the search to the styles that meet your requirements.
Happy shopping!
0points
0out of 0found this answer helpful.
Was this helpful?helpful0unhelpful0
1 of 1
  • 2016-09-08 T12:45:09.874-05:00
  • bvseo_lps, prod_bvqa, vn_prr_5.6
  • cp-1, bvpage1
  • co_hasquestionsanswers
  • loc_en_US, sid_202924620, prod, sort_default
1 of 1
  • bvseo_sdk, java_sdk, bvseo-3.1.1
  • CLOUD, getContent, 123ms
  • QUESTIONS, PRODUCT

Customer Reviews

  • bvseo_sdk, java_sdk, bvseo-3.1.1
  • CLOUD, getContent, 54ms
  • REVIEWS, PRODUCT
  • bvseo-msg: The resource to the URL or file is currently unavailable.;