Free Shipping and BOPIS
Discontinued

TrafficMASTER

Model # HD02807

Internet # 202924640

Store SKU # 766592

Critical Path - Color Tumbleweed 12 ft. Carpet

This item has been discontinued.
The Home Depot no longer carries this specific product.
Please select another option below.

$1.88 /sq. ft.
Covers 9.0 sq. ft.
$16.92 / square yard
Loading...

PRODUCT OVERVIEW

Model # HD02807

Internet # 202924640

Store SKU # 766592

Store SO SKU # 1001036546

Bring a new look to your floors with the TrafficMaster Critical Path Tumbleweed 12 ft. Carpet. The tumbleweed color runs throughout the BCF Strudon/PET blended fiber construction for a luxurious appearance. This anti-shock carpet features minimal static and Zipperlock dual-bonding backing for strength.

  • BCF Strudon/PET blended fiber construction offers durability
  • Stain resistant to help maintain a pristine appearance
  • Manufactured from continuous fibers to minimize shedding
  • Scoured and extracted for convenience
  • Anti-shock properties help reduce static
  • Eligible for recycling programs
  • Zipperlock dual-bonding backing material provides strength
  • Green Label Plus
  • Note: Product may vary by store.

Info & Guides

You will need Adobe® Acrobat® Reader to view PDF documents. Download a free copy from the Adobe Web site.

SPECIFICATIONS

Dimensions
Approximate Width (in.) 
144 
Carpet Width (ft.) 
12 
Carpet roll width (in.) 
144 
Pattern Match Length (in.) 
.375 
Pattern Match Width (in.) 
.875 
Pile height (in.) 
.28 
Product Width (in.) 
144 
Standard Roll Length (ft.) 
120 
Details
Antimicrobial 
No 
Carpet Fiber 
Other 
Carpet Style Type 
Loop 
Carpet Type 
Active & Commercial 
Color Family 
Grays 
Color/Finish 
Tumbleweed 
Commercial / Residential 
Commercial / Residential 
Default Pad 
Berber 
Density 
4700 
Face Weight (oz./ sq.yd.) 
26 
Flooring Product Type 
Carpet 
Glue Down Allowed? 
Yes 
Hypoallergenic 
No 
Indoor/Outdoor 
Indoor 
PAR Rating 
Padding Attached 
No 
Roll/Tile 
Roll 
Stain Resistant 
Yes 
Water repellent 
No 
Yarn Gauge (in.) 
.1 
Warranty / Certifications
Manufacturer Warranty 
Lifetime Residential and Commercial Wear, Lifetime Zipperlock & No Edge Ravel, Lifetime Stainproof no exceptions, Lifetime antishock 

CUSTOMER REVIEWS

SHIPPING AND DELIVERY OPTIONS

Store Exclusive. This item is available for purchase in select stores only.