TrafficMASTER Critical Path - Color Tumbleweed 12 ft. Carpet-HD02807 - The Home Depot
Discontinued

TrafficMASTER

Model # HD02807

Internet # 202924640

Store SKU # 766592

Critical Path - Color Tumbleweed 12 ft. Carpet


TrafficMASTER Critical Path - Color Tumbleweed 12 ft. Carpet
 

This item has been discontinued.
The Home Depot no longer carries this specific product.

$1.88 / sq. ft.
$16.92/  square yard  (covers 9.0 sq. ft.)
Loading...

PRODUCT OVERVIEW

Model # HD02807

Internet # 202924640

Store SKU # 766592

Store SO SKU # 1001036546

Bring a new look to your floors with the TrafficMaster Critical Path Tumbleweed 12 ft. Carpet. The tumbleweed color runs throughout the BCF Strudon/PET blended fiber construction for a luxurious appearance. This anti-shock carpet features minimal static and Zipperlock dual-bonding backing for strength.

  • BCF Strudon/PET blended fiber construction offers durability
  • Stain resistant to help maintain a pristine appearance
  • Manufactured from continuous fibers to minimize shedding
  • Scoured and extracted for convenience
  • Anti-shock properties help reduce static
  • Eligible for recycling programs
  • Zipperlock dual-bonding backing material provides strength
  • Green Label Plus
  • Note: Product may vary by store.

Info & Guides

You will need Adobe® Acrobat® Reader to view PDF documents. Download a free copy from the Adobe Web site.

SPECIFICATIONS

Dimensions
Approximate Width (in.)  144  Assembled Depth (in.)  1 in 
Assembled Height (in.)  .4 in  Assembled Width (in.)  144 in 
Carpet Width (ft.)  12  Carpet roll width (in.)  144 
Pattern Match Length (in.)  .375  Pattern Match Width (in.)  .875 
Pile height (in.)  .28  Standard Roll Length (ft.)  120 
Details
Antimicrobial  No  Carpet Fiber  Other 
Carpet Style Type  Loop  Carpet Type  Active & Commercial 
Color Family  Grays  Color/Finish  Tumbleweed 
Commercial / Residential  Commercial / Residential  Default Pad  Berber 
Density  4700  Face Weight (oz./ sq.yd.)  26 
Flooring Product Type  Carpet  Glue Down Allowed?  Yes 
Hypoallergenic  No  Indoor/Outdoor  Indoor 
PAR Rating  Padding Attached  No 
Roll/Tile  Roll  Stain Resistant  Yes 
Water repellent  No  Yarn Gauge (in.)  .1 
Warranty / Certifications
Manufacturer Warranty  Lifetime Residential and Commercial Wear, Lifetime Zipperlock & No Edge Ravel, Lifetime Stainproof no exceptions, Lifetime antishock 

CUSTOMER REVIEWS

SHIPPING AND DELIVERY OPTIONS

Store Exclusive. This item is available for purchase in select stores only.