Model # HD02807

Internet #202924640

Store SKU #766592

TrafficMASTER Critical Path - Color Tumbleweed Berber 12 ft. Carpet
0859013002040

TrafficMASTER

Critical Path - Color Tumbleweed Berber 12 ft. Carpet

$2.03 /sq. ft.
Covers 9.00 sq. ft.
$18.27 /square yard

Choose Your Options

Tumbleweed
  • Cream
  • Flax
  • Khaki
  • Mocha
  • Pepper
  • Sparkle Gray
  • Terra Cotta
  • Tumbleweed

Frequently Bought Together

Product Overview

INSTALLATION SERVICES

What to Consider Before You Buy

The Home Depot offers professional flooring installation by industry experts with the experience to get the job done right.

If you're interested in having us install your new flooring, schedule an appointment to have our rooms professionally measure before you buy the flooring materials. Otherwise, we cannot install it for you.

3 Steps to Expert Installation

Homedepot Image

1. Schedule an In-Home Measure

We'll come evaluate your site, verify measurements and determine any special installation requirements. The measure fee (starting from $35) will be credited toward the cost of your installation.

Homedepot Image

2. Meet with a Specialist In-Store

Our specialist will help you choose the best flooring for your needs and schedule your professional installation appointment.

Homedepot Image

3. Transform Your Home

Know your project is getting done right. We only partner with flooring installation experts you can rely on.

Bring a new look to your floors with the TrafficMASTER Critical Path Tumbleweed 12 ft. Carpet. The tumbleweed color runs throughout the BCF Strudon/PET blended fiber construction for a luxurious appearance. This anti-shock carpet features minimal static and Zipperlock dual-bonding backing for strength.

  • BCF Strudon/PET Blended Fiber construction offers durability
  • Lifetime stain warranty as long as the carpet is installed and maintained indoors according to carpet and rug institute
  • Critical path is scoured and extracted to remove processing oils which makes the carpet easier to clean and helps prevent accelerated soiling known as rapid resoil
  • Manufactured from continuous fibers to minimize shedding
  • Yearly hot water extraction is recommended to maintain your carpet; daily spot cleaning and wiping up spills as quickly as possible will prolong the beauty of your investment
  • Machine tufted and backed in Canada
  • Sold in 1 ft. increments to minimize waste
  • Zipperlock dual-bonding backing material provides strength
  • 6 lb. or 8 lb. pad recommended for residential installation -not included; 3/8 15 lb. pad for commercial installation-not included
  • Anti-shock properties help reduce static
  • Eligible for recycling programs
  • Carpet is Green Label Plus certified
  • Note: product may vary by store

Info & Guides

You will need Adobe® Acrobat® Reader to view PDF documents.  Download a free copy from the Adobe Web site.

Specifications

Dimensions

Details

Warranty / Certifications

More Products With These Features

Search

Customer Questions & Answers

Does this carpet have to be glued down? Can it be stretched and attached to tack strip?

Asked by: Anonymous
It was attached to a tack strip by the installers - it was not glued down.
Answered by: Jason
Date published: 2015-11-06

How long does it take from ordering the carpet to receiving it ?

How long does it take from ordering the carpet to receiving it ?
Asked by: bea
Hi Bea, since carpet orders are handled through your local store, and the time of arrival on a product can depend on many different factors, we suggest that on the product page you may select the 'Schedule A Measure' button and follow the steps to determine in-store availability and pricing. You may also reach out to your local Home Depot store for more information and assistance as well. I have also provided below the link to our Carpet Installation page on Homedepot.com. We appreciate your business and look forward to serving you in the future. Thank you for shopping Home Depot! http://www.homedepot.com/webapp/catalog/servlet/ContentView?pn=SV_HS_Carpet_Installation&storeId=10051&langId=-1&catalogId=10053
Answered by: THDSupport
Date published: 2016-12-02

Ho to cut this carpet for seaming

HD02808 Critical Path -
Asked by: mike
You can cut the carpet with a utility knife.
Answered by: CommunityAnswer
Date published: 2016-03-06

I need a small piece of Critical Path cream as a patch for some damage done by a pet. How can I get this?

Asked by: Jane
Thank you for interest in Traffic Master Critical Path. This material can be special ordered through your local Home Depot store. The minimum quantity that can be purchased is 1.33 SY. To locate your local store, click on the store locator tab at the top of The Home Depot website. www.homedepot.com
Answered by: TrafficMaster Expert
Date published: 2015-09-20
  • y_2017, m_4, d_24, h_8CST
  • bvseo_bulk, prod_bvqa, vn_bulk_1.0.0-hotfix-1
  • cp_1, bvpage1
  • co_hasquestionsanswers, tq_11
  • loc_, sid_202924640, prod, sort_[SortEntry(order=NUM_ANSWERS, direction=DESCENDING), SortEntry(order=SUBMISSION_TIME, direction=DESCENDING), SortEntry(order=LAST_APPROVED_ANSWER_SUBMISSION_TIME, direction=DESCENDING), SortEntry(order=LAST_APPROVED_ANSWER_SUBMISSION_TIME, direction=DESCENDING), SortEntry(order=BEST_ANSWER_FEEDBACK_COUNT, direction=DESCENDING), SortEntry(order=POSITIVE_ANSWER_FEEDBACK_COUNT, direction=DESCENDING), SortEntry(order=NUM_ANSWERS, direction=DESCENDING)]
  • clientName_homedepot
  • bvseo_sdk, java_sdk, bvseo-3.1.1
  • CLOUD, getContent, 82ms
  • QUESTIONS, PRODUCT

Customer Reviews

  • bvseo_sdk, java_sdk, bvseo-3.1.1
  • CLOUD, getContent, 108ms
  • REVIEWS, PRODUCT
  • bvseo-msg: The resource to the URL or file is currently unavailable.;