Based on your current location, we have chosen a store to give you the most up-to-date selections and pricing available.
If this is not your preferred local store, please change store now.
We were unable to identify your local store. Please enter your ZIP Code and select your local store, so we can provide current product and pricing information available for your area.
Select a Store for more info on inventory and pick up options.
The TrafficMaster Critical Path 01 Sparkle Gray Loop 12 ft. Carpet helps bring a fresh, new look to your home. This carpet features continuous BCF Strudon/PET blended fiber construction which helps to minimize shedding. The Zipperlock dual-bonding backing material provides strength for a long-lasting use. This carpet is eligible for recycling programs and is Green Label Plus certified.
| Antimicrobial | No | Approximate Width (in.) | 144 |
| Assembled Depth (in.) | 1 in | Assembled Height (in.) | .4 in |
| Assembled Width (in.) | 144 in | Carpet Fiber | Other |
| Carpet Style Type | Loop | Carpet Type | Residential |
| Carpet Width (ft.) | 12 | Carpet roll width (in.) | 144 |
| Color Family | Grays | Color/Finish | Sparkle Gray |
| Commercial / Residential | Commercial / Residential | Density | 4700 |
| Face Weight (oz./ sq.yd.) | 26 | Fiber content | BCF Strudon/PET Blend |
| Glue Down | Yes | Hypoallergenic | No |
| Indoor/Outdoor | Indoor | Introduction Date | 11/01/10 |
| MFG Product Name | Critical Path | Manufacturer Warranty | Lifetime Residential and Commercial Wear, Lifetime Zipperlock & No Edge Ravel, Lifetime Stainproof no exceptions, Lifetime antishock |
| Marine | No | PAR Rating | 3 |
| Padding Attached | No | Pattern Match Length (in.) | .375 |
| Pattern Match Width (in.) | .875 | Pile height (in.) | .28 |
| Recycled Materials (%) | 0 | Roll/Tile | Roll |
| Sample available | Yes | Stain Resistant | Yes |
| Standard Roll Length (ft.) | 120 | Water repellent | No |
| Yarn Gauge (in.) | .1 |
You will need Adobe® Acrobat® Reader to view PDF documents.
Download
a free copy from the Adobe Web site.
Warranty
For warranty information on this product, please call our Internet Customer Service Center at 1-800-435-4654.
Store Exclusive. This item is available for purchase in select stores only.
This item is also available for pick up in your local store (FREE) within 4-7 business days, plus order processing time.
Special Financing Available Everyday*
The Home Depot makes home installation easy.
Get a Free ConsultationFind everything you need for your move.
Get StartedThe Home Depot offers afford- able rental rates.
Explore RentalsMore saving. More doing.
On the go.
Visit and like us
on Facebook
Stay connected with us
on Twitter
Follow our Pinterest boards
for projects and inspiration
Get the latest products,
project tips and ideas
View DIY project and
product videos
Can't find what you're
looking for? Please call us:
1-800-HOME-DEPOT
1-800-(466-3337)
† Local store prices may vary from those displayed. Products shown as available are normally stocked but inventory levels cannot be guaranteed. © 2000-2013 Homer TLC, Inc. All Rights Reserved. Use of this site is subject to certain Terms of Use which constitute a legal agreement between you and The Home Depot U.S.A. Inc.
