Building a Single-Level Raised Deck

Decks are a perfect area for outdoor entertaining and outdoor relaxing. The style of deck you choose to build determines how you use your deck, as well as how you build it. Although similar in appearance, different decks can require different construction techniques.

Our Installation Services Associates built this Single-Level Raised deck and documented the steps taken in order to help you build your own outdoor living area.

Add to Your Projects

What You'll Need

Skill Scale
Hard

Time Required
Building a single-level raised deck should take about 88-101 hours.

 

Steps

Step One
Single Level Deck Step 1

Batterboards and mason's string lines were used here to lay out footing locations for a deck that is 24 feet long and 14 feet wide. A 2x12 ledger board was first attached to the house to establish the deck position. The deck structure, including number of footings, was designed to be enclosed as a four-season porch in the near future.

Approximate time for a novice (with a helper) to lay out footing locations for this deck: 12-14 hours. Time includes removing siding and attaching the ledger.

Step Two
Single Level Deck Step 2

Holes for seven 12-inch-diameter footings were dug. A standard single-level raised deck needs only need four footings, parallel to the house. The extra footings were necessary on this deck to handle the additional weight of the roof and future remodeling project structures. Holes were dug 48 inches deep to get below the local frost line. The bottom of the center footing in the row parallel to the house was flared to 24 inches. The remaining footings were flared to 18 inches. Footings were dug with a power auger. Forty-four 60-pound bags of ready-mix concrete were mixed in a portable power mixer. Post anchors for 6x6 posts were installed and aligned after the concrete cured for 48 hours.

Approximate time (not including curing time): 14-16 hours.

Step Three
Single Level Deck Step 3

6x6 posts were plumbed and temporarily braced in place. Post tops were trimmed to the proper height after posts were positioned. Trimming lines level with the bottom of the ledger were established using a water level. The beam supported by the posts will have joists attached to its inner face.

Approximate time: 6-7 hours.

Step Four
Single Level Deck Step 4

A 24-foot-long beam made of doubled 2x12s was built in place on top of the row of posts parallel to the house. Adjustable post caps attach the beam to the tops of the posts. This beam serves as the header joist because joists will be attached to its inner face. The two rim joists are also beams on this deck because of the future remodeling. They will help carry the weight of the roof. The extra beams are 14 feet long and were also built in place. The remaining length of visible ledger will support the landing at the top end of the stairs. The end of the adjacent 14-foot beam is attached to the ledger with a double joist hanger.

Approximate time: 7-8 hours.

Step Five
Single Level Deck Step 5

14-foot-long 2x12 joists were installed. The large size of the framing on this deck accommodates the future remodeling. Joist hangers attach joists to the ledger and beam header joist. Blocking pieces were fastened between joists in the middle of the span to prevent twisting of the joists. Most of the temporary bracing was removed after joists were installed.

Approximate time: 8-9 hours.

Step Six
Single Level Deck Step 6

5/4x6 decking was attached perpendicular to the joists and fastened with deck screws. No additional blocking was necessary because seams between boards were centered over joists. The seams were staggered between adjacent rows of decking for best appearance.

Approximate time: 7-8 hours.

Step Seven
Single Level Deck Step 7

Footings for stair landings and pad were located after the main deck platform was built. Locating stair footings is more accurate when done relative to an existing deck structure. One 12-inch-diameter footing was made for a 6x6 post that will support the upper landing. Four 8-inch-diameter footings were made for 4x4 posts that will support a small transition landing in the stair run. The stair run makes a 90-degree turn at the landing to end on the 4x4-foot pad. The pad is 4 inches thick. Thirty-two 60-pound bags of concrete were mixed in a portable power mixer.

Approximate time (including making a form for the pad): 6-7 hours.

Step Eight
Single Level Deck Step 8

Post anchors were attached to the footings. Posts were plumbed and the framing for the landings installed. Decking was attached to the joists. Note: The landing could be replaced by another deck level on a multilevel deck if desired. Calculations for the stair runs were checked, and the stringers for the stairs were made. The upper and lower stair runs were built in place.

Approximate time: 16-18 hours.

Step Nine
Single Level Deck Step 9

Railing post locations were calculated and the railing posts installed. Posts were notched and attached to the outside of the perimeter framing and stringers. The two posts at the bottom end of the upper stair run are longer than other posts because they also serve as posts for adjoining railings. This saved the time and money of installing two additional posts.

Approximate time: 12-14 hours.

Total approximate time for this deck: 88-101 hours.

 
How-To Overview
 
How-To Categories
Appliances
Bath
Building Materials
Décor
Doors & Windows
Electrical
Flooring
Kitchen
Lighting & Fans
Outdoors
Paint
Plumbing
Spring
Storage & Organization
Tools & Hardware
How-To Resources
Buying Guides
Calculators
Design Tools
Project Guides
Weather Center
More Ways to Learn
Garden Club
Do-It-Yourself Workshops
Video Library

Your Projects

Log In to Access Your Projects

  *Required Fields
 
  Forget Your Password? Click here
  Create an Account
Expert Tip

Safety Alert!

Use appropriate safety gear and follow proper safety procedures when building a deck:

  • Wear hearing and eye protection when using all power tools
  • Wear eye protection when using striking tools
  • Wear a dust mask when cutting lumber and mixing concrete
  • Wear gloves and work boots when handling lumber and concrete. (DO NOT wear gloves when operating power saws)
  • Use GFCI-protected power cords when operating power tools outdoors
  • Use manufacturer-approved hardware and fasteners for all wood products. Check with the manufacturer or your local supplier for more information.