Model # HD02803

Internet #202924626

Store SKU #766592

TrafficMASTER Critical Path - Color Cream Textured Graphic Berber 12 ft. Carpet
0859013002026

TrafficMASTER

Critical Path - Color Cream Textured Graphic Berber 12 ft. Carpet

$2.03 /sq. ft.
Covers 9.0 sq. ft.
$18.27 /square yard

Choose Your Options

Cream
  • Cream
  • Flax
  • Khaki
  • Mocha
  • Pepper
  • Sparkle Gray
  • Terra Cotta
  • Tumbleweed
store icon Loading Buying Options...
package icon Loading Buying Options...
Sorry, but we ran into issues loading these options. Please try refreshing.

Frequently Bought Together

Product Overview

INSTALLATION SERVICES

What to Consider Before You Buy

The Home Depot offers professional flooring installation by industry experts with the experience to get the job done right.

If you're interested in having us install your new flooring, schedule an appointment to have our rooms professionally measure before you buy the flooring materials. Otherwise, we cannot install it for you.

3 Steps to Expert Installation

Homedepot Image

1. Schedule an In-Home Measure

We'll come evaluate your site, verify measurements and determine any special installation requirements. The measure fee (starting from $35) will be credited toward the cost of your installation.

Homedepot Image

2. Meet with a Specialist In-Store

Our specialist will help you choose the best flooring for your needs and schedule your professional installation appointment.

Homedepot Image

3. Transform Your Home

Know your project is getting done right. We only partner with flooring installation experts you can rely on.

The TrafficMASTER Critical Path Cream 12 ft. Carpet features durable BCF Strudon/PET blended fibers and continuous-fiber construction to help minimize shedding. The Zipperlock dual-bonding backing material provides strength for a long-lasting use. The cream color coordinates with endless color schemes for versatility.
  • 80% BCF Strudon/20% PET Blended Fiber construction offers durability
  • Lifetime stain warranty as long as the carpet is installed and maintained indoors according to carpet and rug institute
  • Critical path is scoured and extracted to remove processing oils which makes the carpet easier to clean and helps prevent accelerated soiling known as rapid resoil
  • Manufactured from continuous fibers to minimize shedding
  • Yearly hot water extraction is recommended to maintain your carpet; daily spot cleaning and wiping up spills as quickly as possible will prolong the beauty of your investment
  • Machine tufted and backed in Canada
  • Sold in 1 ft. increments to minimize waste
  • Zipperlock dual-bonding backing material provides strength
  • 6 lb. or 8 lb. pad recommended for residential installation - not included; 3/8 15 lb. pad for commercial installation - not included
  • Anti-shock properties help reduce static
  • Eligible for recycling programs
  • Carpet is Green Label Plus certified
  • Note: product may vary by store

Product Overview

Model #: HD02803
Sku #: 766592
Internet #: 202924626

The TrafficMASTER Critical Path Cream 12 ft. Carpet features durable BCF Strudon/PET blended fibers and continuous-fiber construction to help minimize shedding. The Zipperlock dual-bonding backing material provides strength for a long-lasting use. The cream color coordinates with endless color schemes for versatility.

  • 80% BCF Strudon/20% PET Blended Fiber construction offers durability
  • Lifetime stain warranty as long as the carpet is installed and maintained indoors according to carpet and rug institute
  • Critical path is scoured and extracted to remove processing oils which makes the carpet easier to clean and helps prevent accelerated soiling known as rapid resoil
  • Manufactured from continuous fibers to minimize shedding
  • Yearly hot water extraction is recommended to maintain your carpet; daily spot cleaning and wiping up spills as quickly as possible will prolong the beauty of your investment
  • Machine tufted and backed in Canada
  • Sold in 1 ft. increments to minimize waste
  • Zipperlock dual-bonding backing material provides strength
  • 6 lb. or 8 lb. pad recommended for residential installation - not included; 3/8 15 lb. pad for commercial installation - not included
  • Anti-shock properties help reduce static
  • Eligible for recycling programs
  • Carpet is Green Label Plus certified
  • Note: product may vary by store

Info & Guides

You will need Adobe® Acrobat® Reader to view PDF documents. Download a free copy from the Adobe Web site.

Specifications

Dimensions

Approximate Width (in.)
144
Carpet Width (ft.)
12
Carpet roll width (in.)
144
Pattern Match Length (in.)
.375
Pattern Match Width (in.)
.875
Pile height (in.)
.28
Product Width (in.)
144
Standard Roll Length (ft.)
120

Details

Approximate Length (in.)
12
Carpet Features
Fade and Wear Resistant,Glue Down Allowed,Stain Resistant
Carpet Fiber
Olefin
Carpet Style Type
Berber
Color Family
Beige / Cream
Color/Finish
Cream
Commercial / Residential
Commercial / Residential
Density
4700
Face Weight (oz./ sq.yd.)
26
Flooring Product Type
Carpet
In-Store Availability
Special Order
Indoor/Outdoor
Indoor
Insulation R-Value
.604
Material
Olefin (80%), Polyester (20%)
Origin
Imported
PAR Rating
3
R-Value
.604
Returnable
Non-Returnable
Roll/Tile
Roll
Warranty Type
Stain Warranty,Wear Warranty
Yarn Gauge (in.)
.1

Warranty / Certifications

Manufacturer Warranty
Lifetime Residential and Commercial Wear, Lifetime Zipperlock & No Edge Ravel, Lifetime Stainproof no exceptions, Lifetime antishock

Specifications

Dimensions

Approximate Width (in.)
144
Carpet Width (ft.)
12
Carpet roll width (in.)
144
Pattern Match Length (in.)
.375
Pattern Match Width (in.)
.875
Pile height (in.)
.28
Product Width (in.)
144
Standard Roll Length (ft.)
120

Details

Approximate Length (in.)
12
Carpet Features
Fade and Wear Resistant,Glue Down Allowed,Stain Resistant
Carpet Fiber
Olefin
Carpet Style Type
Berber
Color Family
Beige / Cream
Color/Finish
Cream
Commercial / Residential
Commercial / Residential
Density
4700
Face Weight (oz./ sq.yd.)
26
Flooring Product Type
Carpet
In-Store Availability
Special Order
Indoor/Outdoor
Indoor
Insulation R-Value
.604
Material
Olefin (80%), Polyester (20%)
Origin
Imported
PAR Rating
3
R-Value
.604
Returnable
Non-Returnable
Roll/Tile
Roll
Warranty Type
Stain Warranty,Wear Warranty
Yarn Gauge (in.)
.1

Warranty / Certifications

Manufacturer Warranty
Lifetime Residential and Commercial Wear, Lifetime Zipperlock & No Edge Ravel, Lifetime Stainproof no exceptions, Lifetime antishock

Questions & Answers

I need a small piece of Critical Path cream as a patch for some damage done by a pet. How can I get this?

Asked by: Jane
Thank you for interest in Traffic Master Critical Path. This material can be special ordered through your local Home Depot store. The minimum quantity that can be purchased is 1.33 SY. To locate your local store, click on the store locator tab at the top of The Home Depot website. www.homedepot.com
Answered by: BrandAnswers
Date published: 2015-09-20

How do I get carpet samples for critical path?

I need samples for Cream 03 and Khaki 08.
Asked by: Dick
Thank you for your interest in Traffic Master Critical Path. Please send me your name, address, and phone number and I will be able to send these samples directly to you. If you prefer, your local Home Depot flooring specialist will be able to order these for you.
Answered by: BrandAnswers
Date published: 2015-09-20
  • y_2017, m_11, d_20, h_24CST
  • bvseo_bulk, prod_bvqa, vn_bulk_2.0.3
  • cp_1, bvpage1
  • co_hasquestionsanswers, tq_2
  • loc_, sid_202924626, prod, sort_[SortEntry(order=NUM_ANSWERS, direction=DESCENDING), SortEntry(order=SUBMISSION_TIME, direction=DESCENDING), SortEntry(order=LAST_APPROVED_ANSWER_SUBMISSION_TIME, direction=DESCENDING), SortEntry(order=LAST_APPROVED_ANSWER_SUBMISSION_TIME, direction=DESCENDING), SortEntry(order=BEST_ANSWER_FEEDBACK_COUNT, direction=DESCENDING), SortEntry(order=POSITIVE_ANSWER_FEEDBACK_COUNT, direction=DESCENDING), SortEntry(order=NUM_ANSWERS, direction=DESCENDING)]
  • clientName_homedepot
  • bvseo_sdk, java_sdk, bvseo-3.1.1
  • CLOUD, getContent, 95ms
  • QUESTIONS, PRODUCT

Customer Reviews

  • bvseo_sdk, java_sdk, bvseo-3.1.1
  • CLOUD, getContent, 131ms
  • REVIEWS, PRODUCT
  • bvseo-msg: The resource to the URL or file is currently unavailable.;