Model # HD02801

Internet #202924616

Store SKU #766592

TrafficMASTER Critical Path - Color Sparkle Gray Textured Graphic Berber 12 ft. Carpet
0859013002002

TrafficMASTER

Critical Path - Color Sparkle Gray Textured Graphic Berber 12 ft. Carpet

$2.03 /sq. ft.
Covers 9.0 sq. ft.
$18.27 /square yard

Choose Your Options

Sparkle Gray
  • Cream
  • Flax
  • Khaki
  • Mocha
  • Pepper
  • Sparkle Gray
  • Terra Cotta
  • Tumbleweed
store icon Loading Buying Options...
package icon Loading Buying Options...
Sorry, but we ran into issues loading these options. Please try refreshing.

Frequently Bought Together

Product Overview

INSTALLATION SERVICES

What to Consider Before You Buy

The Home Depot offers professional flooring installation by industry experts with the experience to get the job done right.

If you're interested in having us install your new flooring, schedule an appointment to have our rooms professionally measure before you buy the flooring materials. Otherwise, we cannot install it for you.

3 Steps to Expert Installation

Homedepot Image

1. Schedule an In-Home Measure

We'll come evaluate your site, verify measurements and determine any special installation requirements. The measure fee (starting from $35) will be credited toward the cost of your installation.

Homedepot Image

2. Meet with a Specialist In-Store

Our specialist will help you choose the best flooring for your needs and schedule your professional installation appointment.

Homedepot Image

3. Transform Your Home

Know your project is getting done right. We only partner with flooring installation experts you can rely on.

The TrafficMASTER Critical Path 01 Sparkle Gray Loop 12 ft. Carpet helps bring a fresh, new look to your home. This carpet features continuous BCF Strudon/PET blended fiber construction which helps to minimize shedding. The Zipperlock dual-bonding backing material provides strength for a long-lasting use. This carpet is eligible for recycling programs and is Green Label Plus certified.
  • BCF Strudon/PET blended fiber construction offers durability
  • Lifetime stain warranty as long as the carpet is installed and maintained indoors according to carpet and rug institute
  • Critical path is scoured and extracted to remove processing oils which makes the carpet easier to clean and helps prevent accelerated soiling known as rapid resoil
  • Manufactured from continuous fibers to minimize shedding
  • Yearly hot water extraction is recommended to maintain your carpet; daily spot cleaning and wiping up spills as quickly as possible will prolong the beauty of your investment
  • Machine Tufted and Backed in Canada
  • Sold in 1 ft. increments to minimize waste
  • Zipperlock dual-bonding backing material provides strength
  • 6 lb. or 8 lb. pad recommended for residential installation-not included; 3/8 15 lb. pad for commercial installation-not included
  • Anti-shock properties help reduce static
  • Eligible for recycling programs
  • Carpet is Green Label Plus certified
  • Note: Product may vary by store

Product Overview

Model #: HD02801
Sku #: 766592
Internet #: 202924616

The TrafficMASTER Critical Path 01 Sparkle Gray Loop 12 ft. Carpet helps bring a fresh, new look to your home. This carpet features continuous BCF Strudon/PET blended fiber construction which helps to minimize shedding. The Zipperlock dual-bonding backing material provides strength for a long-lasting use. This carpet is eligible for recycling programs and is Green Label Plus certified.

  • BCF Strudon/PET blended fiber construction offers durability
  • Lifetime stain warranty as long as the carpet is installed and maintained indoors according to carpet and rug institute
  • Critical path is scoured and extracted to remove processing oils which makes the carpet easier to clean and helps prevent accelerated soiling known as rapid resoil
  • Manufactured from continuous fibers to minimize shedding
  • Yearly hot water extraction is recommended to maintain your carpet; daily spot cleaning and wiping up spills as quickly as possible will prolong the beauty of your investment
  • Machine Tufted and Backed in Canada
  • Sold in 1 ft. increments to minimize waste
  • Zipperlock dual-bonding backing material provides strength
  • 6 lb. or 8 lb. pad recommended for residential installation-not included; 3/8 15 lb. pad for commercial installation-not included
  • Anti-shock properties help reduce static
  • Eligible for recycling programs
  • Carpet is Green Label Plus certified
  • Note: Product may vary by store

Info & Guides

You will need Adobe® Acrobat® Reader to view PDF documents. Download a free copy from the Adobe Web site.

Specifications

Dimensions

Approximate Width (in.)
144
Carpet Width (ft.)
12
Carpet roll width (in.)
144
Pattern Match Length (in.)
.375
Pattern Match Width (in.)
.875
Pile height (in.)
.28
Product Width (in.)
144
Standard Roll Length (ft.)
120

Details

Approximate Length (in.)
12
Carpet Features
Fade and Wear Resistant,Glue Down Allowed,Stain Resistant
Carpet Fiber
Olefin
Carpet Style Type
Berber
Color Family
Grays
Color/Finish
Sparkle Gray
Commercial / Residential
Commercial / Residential
Density
4700
Face Weight (oz./ sq.yd.)
26
Flooring Product Type
Carpet
In-Store Availability
Special Order
Indoor/Outdoor
Indoor
Insulation R-Value
.60
Material
Olefin (80%), Polyester (20%)
Origin
Imported
PAR Rating
3
R-Value
.60
Returnable
Non-Returnable
Roll/Tile
Roll
Warranty Type
Stain Warranty,Wear Warranty
Yarn Gauge (in.)
.1

Warranty / Certifications

Manufacturer Warranty
Lifetime Residential and Commercial Wear, Lifetime Zipperlock & No Edge Ravel, Lifetime Stainproof no exceptions, Lifetime antishock

Specifications

Dimensions

Approximate Width (in.)
144
Carpet Width (ft.)
12
Carpet roll width (in.)
144
Pattern Match Length (in.)
.375
Pattern Match Width (in.)
.875
Pile height (in.)
.28
Product Width (in.)
144
Standard Roll Length (ft.)
120

Details

Approximate Length (in.)
12
Carpet Features
Fade and Wear Resistant,Glue Down Allowed,Stain Resistant
Carpet Fiber
Olefin
Carpet Style Type
Berber
Color Family
Grays
Color/Finish
Sparkle Gray
Commercial / Residential
Commercial / Residential
Density
4700
Face Weight (oz./ sq.yd.)
26
Flooring Product Type
Carpet
In-Store Availability
Special Order
Indoor/Outdoor
Indoor
Insulation R-Value
.60
Material
Olefin (80%), Polyester (20%)
Origin
Imported
PAR Rating
3
R-Value
.60
Returnable
Non-Returnable
Roll/Tile
Roll
Warranty Type
Stain Warranty,Wear Warranty
Yarn Gauge (in.)
.1

Warranty / Certifications

Manufacturer Warranty
Lifetime Residential and Commercial Wear, Lifetime Zipperlock & No Edge Ravel, Lifetime Stainproof no exceptions, Lifetime antishock

Questions & Answers

  • bvseo_sdk, java_sdk, bvseo-3.1.1
  • CLOUD, getContent, 134ms
  • QUESTIONS, PRODUCT
  • bvseo-msg: The resource to the URL or file is currently unavailable.;

Customer Reviews

  • bvseo_sdk, java_sdk, bvseo-3.1.1
  • CLOUD, getContent, 227ms
  • REVIEWS, PRODUCT
  • bvseo-msg: The resource to the URL or file is currently unavailable.;