0043481001050

GE

Model THQLRK2CP

Internet #100142584

Store SKU #482398

PowerMark Gold Main Breaker Retainer Kit

$1.71 /each

Frequently Bought Together

Product Overview

The GE PowerMark Gold Main Breaker Retainer Kit is designed for use only in PowerMark Gold main lug load centers. It provides locking functionality when a back-fed main breaker is used. It's use insures NEC requirements.

  • Use as a retaining clip with back-fed main breakers 125 Amp or below
  • Compatible with PowerMark gold main lug load centers
  • Easily installed
  • ANSI certified and UL listed

Info & Guides

You will need Adobe® Acrobat® Reader to view PDF documents.  Download a free copy from the Adobe Web site.

Specifications

Dimensions

Details

Warranty / Certifications

More Products With These Features

Search

Customer Questions & Answers

3 Questions3 Answers

Customer Questions & Answers

PowerMark Gold Main Breaker Retainer Kit
PowerMark Gold Main Breaker Retainer Kit

Ask your questions. Share your answers.

 
 
Clear Search Term
 
 
Sort By:
 
1 answer

IS THEIR A PICTURE OR DIAGRAM SHOWING YOU HOW THE RETAINER KIT GOES ON

This question is from PowerMark Gold Main Breaker Retainer Kit
Asked by
JJ
CORPUS CHRISTI TEXAS
September 23, 2013
0points
0out of 0found this question helpful.
Was this helpful?helpful0unhelpful0

Answer (1)

Asked by
Atlanta, GA
Read all my Q&A
September 27, 2013
Answer: 
Hi JJ,
Thank you for your question.
The MFG has provided a picture on this. – Attached is a picture of installed THQLRK2CP. The breaker must go in the upper right corner of the load center. The clip fits over 2 “nibs” molded in the plastic. The lock washer is then placed on the larger “nib” to hold it in place.
Hope this helps
User submitted photo
+4points
4out of 4found this answer helpful.
Was this helpful?helpful4unhelpful0
 
1 answer

i need a diagram or pict of the final installation.

This question is from PowerMark Gold Main Breaker Retainer Kit
Asked by
swd
McKinney,Tx
February 15, 2012
0points
0out of 0found this question helpful.
Was this helpful?helpful0unhelpful0

Answer (1)

Asked by
Atlanta, GA
Read all my Q&A
February 27, 2012
Answer: 
Hi SWD,
Thank you for your question.
I did contact the manufacturer for the diagram /picture on the final installation, however they did not have one. Here is their recommended steps :
"The directions included are very clear on how to install. Short version…looking at enclosure with the lugs facing up; the 2 pole breaker mounts in the upper right hand corner. The locking clip is then placed on it to Read More
Hi SWD,
Thank you for your question.
I did contact the manufacturer for the diagram /picture on the final installation, however they did not have one. Here is their recommended steps :
"The directions included are very clear on how to install. Short version…looking at enclosure with the lugs facing up; the 2 pole breaker mounts in the upper right hand corner. The locking clip is then placed on it to hold it down. There are small tabs that only allow it to mount one way. It then requires the locking washer to be placed over plastic tab to hold permanently in place (also to meet code)."
Hope this information helps. Read Less
+1point
1out of 1found this answer helpful.
Was this helpful?helpful1unhelpful0
 
1 answer

How to install the main breaker retaining kit - THQLRK3CP

This question is from PowerMark Gold Main Breaker Retainer Kit
Asked by
RB
Us virgin islands
August 25, 2011
0points
0out of 0found this question helpful.
Was this helpful?helpful0unhelpful0

Answer (1)

Asked by
HD 116
www.community.homedepot.com
August 30, 2011
Answer: 
Greetings,
My name is Tom, also known as HD116 at Home depot's How to Community. The main breaker retaining clip is required for applications where a breaker is back-fed (Hot) to a branch position for service entrance equipment such as standby generators, etc.
To install it simply covers over the breaker and is then machine screwed to the panel so that the breaker cannot be easily removed. This is Read More
Greetings,
My name is Tom, also known as HD116 at Home depot's How to Community. The main breaker retaining clip is required for applications where a breaker is back-fed (Hot) to a branch position for service entrance equipment such as standby generators, etc.
To install it simply covers over the breaker and is then machine screwed to the panel so that the breaker cannot be easily removed. This is always done as a precautionary measure, and is required by the NEC.
Thank you for your question, we are happy to help. If you have further questions, you can call GE's answer line for these type of applications at 800-431-7867. Read Less
-2points
1out of 4found this answer helpful.
Was this helpful?helpful1unhelpful3
1 of 1
  • 2016-09-19 T12:45:46.740-05:00
  • bvseo_lps, prod_bvqa, vn_prr_5.6
  • cp-1, bvpage1
  • co_hasquestionsanswers
  • loc_en_US, sid_100142584, prod, sort_default
1 of 1
  • bvseo_sdk, java_sdk, bvseo-3.1.1
  • CLOUD, getContent, 157ms
  • QUESTIONS, PRODUCT

Customer Reviews

Rated 1.0 out of 5 by 1 reviewer.
Rated 1.0 out of 5.0 by Wrong part Even though the package had the correct part number, the part enclosed was not as pictured. It was the reverse of what is required and could not be used. If I could give zero stars, I would. What is up with GE quality control? August 1, 2012
  • 2016-09-14 T11:29:28.376-05:00
  • bvseo_lps, prod_bvrr, vn_prr_5.6
  • cp-1, bvpage1
  • co_hasreviews, tv_1, tr_1
  • loc_en_US, sid_100142584, prod, sort_default
1-1 of 1
  • bvseo_sdk, java_sdk, bvseo-3.1.1
  • CLOUD, getContent, 75ms
  • REVIEWS, PRODUCT