#1 Home Improvement Retailer

Questions and Answers for Delta 48-60 in. W Contemporary Frameless Sliding Shower Track Assembly Kit in Nickel (For 1/4 in. (6mm) Glass)

Internet #206195442

Model #SDLCS60-NIK-R

Store SKU #1001419914

  • Barn door style shower door track with exposed rollers
  • Made from corrosion-resistant aluminum
  • Purchase Delta glass panels and door handles for a complete door

Questions & Answers

94Questions
caret
Q:What is the RO height for this frame
by|Mar 21, 2023
1 Answer
Answer This Question

A:  Dave, thank you for your question. Minimum Required Clearance Heights for Installation: For Shower: 73.5 Inches (186.7 cm), For Tub: 61.75 Inches (157 cm). Minimum Required Installation Wall Heights for Installation: For Shower: 71.25 Inches (181 cm), For Tub: 59 Inches (150 cm). ~Best, Delta Shower Doors Customer Care Team

by|Mar 24, 2023
    caret
    Q:I purchased a delta 500 48 x 34 shower pan and surround. I purchased the 48 x 60 track is that it would be cut down to less than 48 to accommodate that shower.
    by|Feb 28, 2023
    1 Answer
    Answer This Question

    A:  Josh, thank you for your question. Our Customer Care Specialists are available to discuss your question(s) further. Please contact us directly at customersolutions@Deltashowerdoors.com Monday to Friday 8:00 a.m. to 5:00 p.m. EST. ~Best, Delta Shower Doors Customer Care Team

    by|Mar 5, 2023
      caret
      Q:Do we cut the height to fit shower tub doors?
      by|Feb 12, 2023
      3 Answers
      Answer This Question

      A:  You only cut the top and bottom rail don't cut these rails to the same size the top rail maybe longer than the bottom rail the side rails are the height of the glass panels you do not cut these

      by|Feb 14, 2023

        A:  No. You can cut the with of the track. For the height, there are two types of these doors: the tub and stand up shower. You pick the one you need, and place it accordingly to the height of the door.

        by|Feb 13, 2023

          A:  There’s two types of  kits: one for shower/tub combos that fit the shorter glass panels and one for walk in showers that fit the taller glass panels. The height shouldn’t have to be cut just the bottom and top track. 

          by|Jun 14, 2023
            caret
            Q:What is the assembled walk-through height of the door?
            by|Dec 20, 2022
            0 Answer
            Answer This Question
            caret
            Q:Do you have to "step over" the bottom track to get into the shower? I'm going for a 100% curbless walk-in shower and I don't want a track in the way.
            by|Nov 25, 2022
            0 Answer
            Answer This Question
            caret
            Q:All I need is the rollers can I just order them?
            by|Jun 22, 2022
            0 Answer
            Answer This Question
            caret
            Q:Are bottom tracks included?
            by|Jun 10, 2022
            0 Answer
            Answer This Question
            caret
            Q:Where can I order this track? It can't be ordered on-line and its not available instopres
            by|May 8, 2022
            1 Answer
            Answer This Question

            A:  Hello Fred, Thank you for your recent inquiry with The Home Depot. This item is available to ship to store and ship to home; however, this item cannot be shipped to AK,GU,HI,PR,VI. We appreciate your business and look forward to serving you in the future.

            by|May 17, 2022
              caret
              Q:Looking for a couple of actual dimensions... The wall mounted bars look to be about .750x.750 inches .. is that correct? ... also looking for the actual width of the bottom track and the width of the track at the plastic guide ... Thanks
              by|Jan 27, 2022
              3 Answers
              Answer This Question

              A:  Hi I have 3 of these doors: The side rails are 3/4 inch (.75) The bottom rail is track is 1” 3/4 (1.75) and the plastic guide siting on top of the bottom rail makes a total of 2 1/4 inches (2.25)

              by|Jan 24, 2023
                2 found this answer helpful

                A:  TomA, H33, Thank you for your question on the Delta 48 to 60 in. Contemporary Sliding Shower Door Track Assembly Kit in Nickel. The wall jambs are 7/8 of an inch and bottom track is 2 inches and with guide attached, total measurement is 2-3/4 inches.--Best, Customer Care Team

                by|Jan 28, 2022

                  A:  Side rails 5/8" x 5/8". Bottom rail 1-3/4" with 3/4" outside lip. 2-1/4" at guide. Width at bottom rail to edge of side rail 2-1/4". So from inside plastic guide to outside of side rail 2-3/4". Hope that helps

                  by|Jan 30, 2022
                    caret
                    Q:Where can i order a brown center guide/divider (1) for glass shower doors? I ordered Delta 48-60 in Contemp Sliding Shower Track Assembly Kit in bronze 3 yrs ago. I am looking for this part.
                    by|Sep 16, 2021
                    1 Answer
                    Answer This Question

                    A:  Go to Home Depot see someone in doors and they can order from the vendor

                    by|Sep 19, 2021

                      Frequently Bought Together

                      Exclusive
                      +
                      +
                      Price:
                      $419.00