Installation Timeline: 3-5 Days
Love your layout but not your cabinets? Have your cabinets updated with new doors, cabinet fronts, drawers, hinges, knobs and pulls.

Installation Timeline: 2-12 Weeks
With a full kitchen remodel, the sky is the limit. You have the option to rearrange your kitchen layout, add new appliances, boost your storage space and redesign the look and feel of your kitchen. You'll gain new functionality in your kitchen, from work space organization to entertainment.
Request a consultation to discuss a full remodel using the form at the top of the page, or learn more about our Kitchen Design Services.
Remodeling your kitchen is the perfect opportunity to create a design that’s based on your individual needs. Focus on who will be using the kitchen most and how many people will be working in the space at one time. You’ll want to ensure you have room to work and move around as needed, so consider the work triangle in your new layout.
You’ll also want to think about a dining area, how often you entertain, and what a kitchen with guests would look like. Our team of kitchen designers can develop a variety of options to ensure your new kitchen perfectly fits your lifestyle.
Until your products arrive, you won't need to make any changes. Once the remodel is ready to kick off, you can prep your home by doing the following:
• Start by removing anything hanging from kitchen walls. You'll also want to remove curtains and any breakable light fixtures.
• Empty your cabinets and drawers and clear everything off your countertops. Pack away and label items during the time of the renovation, so things stay organized. Set aside any essential items in an accessible area for use during the remodel.
• Keep the construction space as empty and clean as possible during each project phase. This might even be the perfect time to donate items you rarely use.
• Prevent the spread of dust and debris and limit other damage by placing protective covers over floors and entryways to adjacent rooms.
We will take care of covering your floors and entryways to protect them during your remodel.
November 7, 2026
you need to have more than 1 company doing the countertops. They were totally booked up and I was without a kitchen sink for almost 4 weeks.
- Susu
TX, 76248
November 7, 2026
TX, 76248
November 7, 2026
Everything went well, however there was damage to one of my cabinet doors that did not exist previously and it occurred between the time before they arrived and right after they left. Communication was top notch with Staci W.
- Pleased
WI, 53044
November 7, 2026
WI, 53044
November 7, 2026
Everything was very good except they arrived two hours after the appointment window. Apparently they were held up on another job. They did call and advise it just made it a late start for our project, which didn?t get started till after 4 PM
- RDG
CA, 96003
November 7, 2026
CA, 96003
November 7, 2026
Customers should not pay 100% before the project is completed. Sales pitch could be scaled back a bit with less drama. If a customer is doing the project, the full pitch and drama is unnecessary.
- WW CAB
IN, 46032
November 7, 2026
IN, 46032
November 7, 2026
The problem was with the work order from HD to Stone Concepts. Tear out of the old countertops was not scheduled with the order. When I spoke with the designer I was told it was not on their form being sent to Stone Concepts. The plumbing was disconnected before they arrived, but I did not know that I had to order the tear out separately. I had to reschedule with SC to come back to do the tear out before the installation could be done. Tear out was an unexpected additional $495 charge. The original price should have included tear out since it is part of the job, or at the very least mention it to the customer when writing the order so that it can be added at the time of sale.
- dvskt
NE, 68134
November 7, 2026
NE, 68134